I am working for a large town development that was primarily set increase using dating shortcuts. I have a drawing for fields, hall, novel ground, site grade additionally sewer & water. Entire of the drawings are connected with date crosscut for alignments, profiles & surfaces. One project became broken upward up phases and as phase 1 was among construction we began designing phase 2. To separate the phase I copied and drawings into a new project folder on our network and remapped the evidence shortcuts and renamed a few of this drafts. All seemed to be working well until current when I noticed that depending on which project I had opened latest it would using which project as the reference. Exemplar when opening phase 2 corridor scheme surface she references correctly and then when I opens Phase 1 corridor construction surface it truly pulls the product alignment and profile data from which phase 2 leaflet and this happens both roads depending for what were opened last.
Things to Note:
This project is multi period old and phases what begun in Civic 3d 2013.
We newly upgrated to Civil 3d 2015 when we now believe this was happening previous to the updating.
When we set up our data shortcuts we have been hiring a new working select for each project furthermore novel shortcut folder by the folder.
None of the interface or alignments were renamed int phase 2.
If I open a blank how and browse to the correct data shortcut working folder then open the project everything works fine.
When I did the save as I did this through the Data Beeline Editor, and all of an remapping of projects was done throughout there as well.
Has anyone see anything favorite this? Exists there something wrong with to way we have these set up or our workflow?